
Shenzhen Ainergy Technology Co., Ltd. focuses on BESS. CATL is our partner, and we use the CATL original battery pack with the CATL original BMS to make a BESS with our own inverter (PCS). Our R&D center is located in Shenzhen with around 50 people, and our manufacturing base is in Dongguan with around 200,000 square meters. So far, our BESS has been installed for more than 50 MWh, most of which are in Europe, including the Czech Republic, Germany, Austria, Ukraine, Poland, Hungary, and Slovakia. Our final goal: Ai Storage Technology For A Brighter Future!
4
1
—
—
China
Energy Storage Systems
Shenzhen Ainergy Technology Co., Ltd. energy storage systems
ESS-125-261-L (B1P2-PV120-EU)
Shenzhen Ainergy Technology Co., Ltd.
ESS-125-261kWh
Shenzhen Ainergy Technology Co., Ltd.
ESS-1000-2000kWh-L
Shenzhen Ainergy Technology Co., Ltd.
ESS-2507-5015kWh-H
Shenzhen Ainergy Technology Co., Ltd.